CONTACT US
Sinotai Petroleum Equipment Co., Ltd
Tel:+86-546-8300512
Fax:+86-546-8300512
Email:info@sinotaicn.com
Add:No.67,Fuqiang Road,Shengli Oilfied,Dongying City,Shandong Province,China
Products
TS-SINOTAI, let your work easier and faster
No-guyline workover is a small workover rig without wind load guyline, which is invented according to the characteristics of large number of shallow wells and short operation period of small workover operation in oil field.
◆ Only with two guylines fixed on the supporting without the anchor, improves the disassembly and movement efficiency.
◆ Anti-roll device and anti-tilt anti-collision electronic alarm device ensure the safety of operation.
◆ No-guyline workover rig adopts max. 22m telescope mast or max. 18m single mast.
◆ The mast base has anti-roll and anti-overturn device, and equipped with tilt alarm.
◆ Adopt self-propelled or truck chassis, fast moving and good off-road performance.
◆ Less preparation time before operation, fast rigging-up and rigging-down.